SB-200 Six Meter Conversion
Using the GI-7B

by N4LR and W4ZT
June, 2007

(click the small pictures to see larger pictures in a new browser window)

1
Under side showing removing safety choke.

2
Old plate tune and load caps.

3
Front panel with mods from previous conversion.

4
RF Deck cleaned out.

5
View of front with panel removed. Tony looks in.

6
Front again.

7
Tony trims a piece of copper to tie the socket to the back panel.

8
Tony heat shrinks a piece of tubing on the filament choke.

9
Drilling the socket mounting holes on the drill press.

10
Front panel.

11
New tube location with copper bracket in place

12
More of the socket.

13

14

15

16
Copper bracket detail.

17
Copper bracket detail.

18
Copper bracket detail.

19
Copper bracket detail.

20
Copper bracket detail.
 

 


 

 

 

directNIC Search
Hosted by directNIC.com